Mirabel
Commercial HVAC installation in Mirabel
Aerospace plants in the former-airport sector, logistics warehouses along Autoroutes 15 and 50, and businesses in the Saint-Janvier sector on Boulevard Curé-Labelle: Mirabel brings together buildings with very different ventilation needs.
RBQ-licensed
100% commercial
Free quote

Why it matters
Three settings, three ways to ventilate
Mirabel isn’t a single commercial zone: the territory combines an industrial hub, a logistics corridor and service arteries.
The aerospace hub of the former airport
Around Rue J.-A.-Bombardier and Boulevard Henri-Fabre, high-bay buildings house machining, assembly and subcontracting. Processes demand tight temperature and air control, with rooftop units and make-up air sized for the real loads.
The logistics corridor of Autoroutes 15 and 50
Warehouses and distribution centres with large footprints and high ceilings. The challenge isn’t office comfort: it’s heating and ventilating large volumes, treating air at dock zones and managing the loads of forklifts and goods.
The Saint-Janvier commercial sector
Along Boulevard Curé-Labelle, smaller commercial buildings: stores, restaurants and services. Mostly rooftop units and kitchen exhaust systems that have to meet code.

The system
What we install in Mirabel
From the rooftop unit of a Boulevard Curé-Labelle business to the make-up air system of a former-airport plant.
✓ Rooftop units (RTUs) from commercial to industrial capacity
✓ Make-up air (MAU) systems to offset process exhaust
✓ Warehouse and distribution ventilation suited to high ceilings
✓ NFPA 96-compliant kitchen exhaust for restaurants
✓ Commercial ductwork, control dampers and balancing
Our process
From assessment to commissioning
Coordinated with your operations, permits and inspections included
01
Assessment
Site visit, survey of existing equipment, roof access and building constraints: height, structure and operating hours. We confirm what’s there before proposing anything.
02
Design and quote
Unit sizing, duct routing and make-up air calculation, then a detailed quote: scope of work, equipment and schedule.
03
Installation
Work scheduled outside operating hours when needed, with a phased approach that keeps your production areas and businesses working.
04
Permits and inspections
We handle permit applications and schedule the required inspections as part of the project, under the Quebec Construction Code.
FAQ
Frequently asked questions
What Mirabel businesses ask us
Do you work in factories that stay in operation in Mirabel?
Yes. We coordinate with facility management to work outside operating hours and in phases, to keep production areas working.
Can you install make-up air for a process exhaust system?
Yes. A make-up air unit (MAU) offsets the air removed by process exhaust to maintain building pressure and prevent backdrafting. Sizing starts from the actual exhaust flow.
Do you install HVAC for warehouses and distribution centres?
Yes: high-capacity rooftop units, ventilation of large volumes and air treatment at dock zones. Selection depends on clear height, insulation and internal loads.
Do you work on restaurants on Boulevard Curé-Labelle?
Yes, for NFPA 96-compliant kitchen exhaust and its make-up air, working within the constraints of the existing commercial buildings in the Saint-Janvier sector.
What’s the lead time for a project?
A simple rooftop unit replacement is completed in one to two days once the equipment is delivered. Standard units often carry a multi-week supply lead time; industrial systems run longer.
Do you offer maintenance or a service contract?
No. Nadair is a 100% commercial installation contractor: we impose no maintenance contract. You remain free to assign maintenance to your own supplier.
Go further
Related services
Our other commercial installation pages
Commercial HVAC in Saint-Jérôme
Commercial ventilation in the Laurentians.
Commercial HVAC in Repentigny
Lanaudière commercial and industrial.
Commercial HVAC in Pointe-Claire
The West Island, near Montreal.
Free quote
Let’s talk about your Mirabel building
Plant, warehouse or business: describe the building, its use and what isn’t working.
North Shore and Greater Montreal · RBQ 5844-3979-01 · Commercial installation only
